MES Software: Reports Manual
Configure Work In Process (WIP) Report
Using the report settings of the
Work In Process Report, you are able to display more (or less) information,
dependent on your requirements.
After each change, you have to hit the 'Refresh' button. The WIP report
only shows the
steps that contain parts for the flow that is selected. For each step it
shows the number of Parts and Travelers in that
step.
The following settings are available:
- Part Names: For each step the number of Parts will be grouped by their
Part Definition. (Default is checked)
- Traveler: For each step, now a grouping per Traveler can be shown. Showing the number of Parts
per Traveler. (Default is unchecked)
- Part UIDs: With this option, for each step the individual UIDs for each Part Record or for each Batch
are displayed as separate line items on the Report.
- Flow: From the Flow Pull down the
Flow Definition of interest can be selected.
NOTE: It is not the
State of the Part Record that
determines if Parts show up on the WIP Report. The state of the
Traveler determines if Part Records will show up on the WIP Report. Only
Parts on Active Travelers will show, Parts on 'Done' Travelers will not show up
on the WIP Report.
Useful Links
Click on one of the links in the left sidebar menu, or click one of the following
links to learn more: